CASE 1: Discontinued Parts

Type of goods
Inserts For Hydraulic Power Tong

Challenge
To offer an alternative solution for discontinued crucial hydraulic insert parts. Parts are required to be available on site as soon as possible to maintain the regular flow of operations.

Approach
Ventex International Corporation designed and implemented a simple but effective strategy. Our Company asked for a sample of the discontinued part and requested to some specific suppliers to design and build a prototype to replace parts. After several tests, the right prototype was developed not only solving the problem but also securing a stock of similar pieces designed in “last generation” materials and delivered at the point of destination.

Impact
– More efficient and custom-made version of the discontinued parts.
– Significant savings were achieved.
– Replacement parts were delivered in less time than estimated.

CASE 2: Hard To Find Stock

Type of goods
Water Pressure Set, Spare Part for Marine Platform Rig.

Challenge
To provide electrical spare parts for an offshore facility. Spare parts were requested to competitors and local suppliers by Client without success.

Approach
Ventex International Corporation developed a “quick-response” plan, putting its network of manufacturers in Europe (Germany, Holland, and Switzerland) in action, making possible to quote, negotiate competitive prices, transport and deliver the spare parts in “no-time” at the point of destination.

Impact
– Responsiveness while competitors fail.
– Significant savings were achieved.
– Replacement parts were delivered in less time than estimated.

CASE 3: Fastest Delivery Option

Type of goods
Drill Rig Bearings

Challenge
To deliver rollers for service drill in less time than expected from the manufacturer in Japan to the point of destination in Mexico. The original delivery time was estimated at 8-10 weeks plus travel time.

Approach
Ventex International Corporation focused on delivery in less time. To accomplish this goal, Ventex found a smart solution, and they brought to the table a roller manufacturer based on the US that was able to build an aftermarket part similar to the Japanese one with same materials and similar quality. Those aftermarket parts were available just in a few days in the US and less than one week just across Mexican border where the customer was located.

Impact
– More than 75% improved delivery time.
– Significant savings were achieved in term of pricing and transportation costs.
– Supply Chain management strategy produces a huge difference in the way Client manage this particular procurement need.

CASE 4: Procurement and Logistics Management (Turnkey Solution)

Type of goods
WELL SERVICE RIGS SERVICE EQUIPMENT

Challenge
To assist in an auction of well service equipment for purchase and delivery it to a final destination overseas.

Approach
Ventex International Corporation created a plan to manage the whole process from finding the right equipment in the pre-owned US market, costumer’s representation at the auction and negotiating the right price to deliver the material overseas at the point of destination.

Impact
– 100% Turnkey Solution.
– Effective management strategy regarding finding the right equipment at the right price.
– Client’s expectations were exceeded.